122188 UIRB UIRB 05531500 A 8/12/2003 13:45 REACH S "Harris,Mitchell,Scudder,Barb,Hogan,Jennifer,FazioD" Excellent "sampled TR1-TR7 on 08/12/03 from 16 00-17 40 with stage at 2.53 ft. and discharge of 167 ft3/s at 17 00 CDT, and TR8-TR11 on 08/13/03 from 13 45-14 45; sampling over 2 days with stage about 0.1 ft lower on 08/13/03 than on previous sampling day; for TR2, velocity recorded as 0 ft/s for point 2 should read -0.24 ft/s" 2.43 153 Gage Not Modified 300 30 "100 m DS from walking bridge 41 49 37.92 87 54 23.54" "400 m DS from walking bridge 41 49 31.60 87 54 15.51 " "sampled TR1-TR7 on 08/12/03 from 16 00-17 40 with stage at 2.53 ft. and discharge of 167 ft3/s at 17 00 CDT, and TR8-TR11 on 08/13/03 from 13 45-14 45; sampling over 2 days with stage about 0.1 ft lower on 08/13/03 than on previous sampling day; for TR2, velocity recorded as 0 ft/s for point 2 should read -0.24 ft/s" 10/6/2003 15:33 10/24/2003 10:41